Case Studies
Esholt WWTW Cake Silo Emergency Dig-Out
Esholt WWTW, Bradford | Yorkshire Water
Method of Works
Emergency Overnight Mobilisation
Lowloader with specialist grab and tractor trailers mobilised on Friday night for an early-start Saturday morning response.
Grab Cake Extraction
Specialist grab used to extract cake from within the tight HGV tipping access through to the top of the silo, loading directly into tractor trailers.
Cake Haulage to Conditioning Pad
Loaded trailers transported cake to the conditioning pad at the far end of the site for disposal and treatment.
Specialist Grab for Deep Clearance
Specialist grab attachment used to clear cake from between silo strengthening supports and within the bottom divided screw shaft chambers.
Recycler Jet Wash & Clean Down
Recycler unit deployed to jet and dilute remaining cake, washing down and around all screw shafts to prepare silos for repair works.
Key Challenges & Highlights
Rapid Emergency Response
Works were instructed on a Friday and required overnight mobilisation of a full equipment train – specialist grab, tractor trailers and recycler – to be set up and operational by Saturday morning.
Extremely Confined Working Conditions
The tight HGV tipping access above the silo and the narrow internal chambers severely restricted plant manoeuvring. The specialist grab was essential to reach material within the strengthening supports and screw shaft divisions.
Confined Space Excavation
Working deep within the cake silos required the specialist grab to clear blocked material without damaging the silo structure or screw shaft mechanisms.


← All Case Studies